liverpool based, uk wide

Call [PHONE NUMBER]     info@expandplans.co.uk

Open loft space with a large table
Home  /  Our Services  /  Change of Use

Change of use

Drawings and applications for turning a building from one use into another.

change of use

A new use for an existing building.

We check whether your change of use needs permission, and prepare the drawings and application if it does.

Every building has a planning use, such as a shop, an office or a house. Changing between some uses is allowed automatically, some need prior approval, and some need full planning permission.

The rules are not obvious and they change. We check what applies to your building, then draw the existing and proposed layouts for the application.

What you get

We aim to reply within one working day.

what is included

Changes of use we prepare drawings for.

Shop to cafe or restaurant

Layouts and extraction details for food uses.

Office to residential

Flats created from office space, often through prior approval.

House to HMO

Shared houses, where planning permission may be needed.

Commercial to residential

Shops, pubs and units converted to homes.

House to flats

Subdividing a house into self-contained flats.

Agricultural buildings

Barns and farm buildings converted to homes or other uses.

Open loft space with a large table
Glazed extension added to a stone building
Dining room with rooflights and a view to the kitchen
People reviewing architectural plans on a desk
how we work

The right route, checked first.

Applying for the wrong thing wastes months. We establish the current lawful use and the correct route before any drawing starts.

how it works

Three steps to a submitted application.

01

Talk it through

Tell us about the property and what you want to do. We visit or work from what you send us.

02

We draw it up

We prepare the drawings and send you drafts to check and change.

03

Submission

We finalise the package and submit it, or hand it to you ready to go.

questions

What people ask about change of use.

Do I always need planning permission to change use?

No. Some changes are permitted, some need prior approval and some need full planning permission. It depends on the current and proposed uses and the location.

A lighter-touch process where the council considers specific issues only, such as flooding, noise or transport.

Very often. A change of use usually triggers requirements for fire safety, sound insulation and energy efficiency.

Prior approval decisions are typically made within 56 days. Full applications usually take about eight weeks or more from validation.

Architectural blueprints with drafting tools
get a quote

Let's talk it through.

Tell us about the property and what you want to do. We’ll come back with a fixed quote and the best route to approval.